---
title: "Home Remodeling in Redwood City | Additions, Kitchens & Baths"
description: "Home remodeling in Redwood City by a licensed contractor (CSLB #1073096): Architectural Permit and FAR hearing rules, ADU limits, a kitchen we remodeled."
url: "https://qabuilders.com/service-areas/redwood-city/"
---

From Farm Hill to Redwood Shores

# Home Remodeling in Redwood City

Home remodeling in Redwood City: second stories, additions, kitchens, baths and ADUs.

[Call (669) 213-8077](tel:+16692138077)

[Free estimate](https://qabuilders.com/service-areas/redwood-city/#quote)

## Get a free estimate

Tell us about your project and one of our representatives will get back to you.

(Quote form: same as the other town pages.)

[Areas we serve](https://qabuilders.com/service-areas/) / Redwood City

QA Builders remodels homes in Redwood City: home additions, kitchens, bathrooms, whole-house remodels, ADUs and garage conversions, and new custom homes, as a licensed general building contractor (CSLB #1073096). In Redwood City, a second-story addition needs a city Architectural Permit, and the adjacent neighbors must be notified before that application goes in.

We provide complete design-build and construction services, including permitting and project management. Call [(669) 213-8077](tel:+16692138077) or use the form above.

On this page: [second stories](https://qabuilders.com/service-areas/redwood-city/#second-story), [floor area limits](https://qabuilders.com/service-areas/redwood-city/#floor-area), [ADUs and JADUs](https://qabuilders.com/service-areas/redwood-city/#adus), [city or county permits](https://qabuilders.com/service-areas/redwood-city/#city-or-county), [the kitchen we remodeled](https://qabuilders.com/service-areas/redwood-city/#kitchen-job), [kitchen and bath permits](https://qabuilders.com/service-areas/redwood-city/#kitchen-bath-permits).

## Does a Redwood City second story need an Architectural Permit?

Yes. All new two-story homes and second-story additions in Redwood City require an Architectural Permit. Once the application is complete, the Zoning Administrator evaluates the project against the permit’s required findings; a proposed home over 3,000 sq ft or over 0.45 FAR goes to the Planning Commission at a public hearing, and a hillside home may need a public hearing too. The city’s own advice is to read those findings in advance, make sure the design meets each one, and consult a planner with questions.

The city’s handouts set the order of the planning steps:

1. **Neighbor notice.** The adjacent neighbors are notified before the application goes in.
2. **Application.** The signed notices go in with the Architectural Permit application, and within 30 days of submittal and fee payment the city decides whether the application is complete.
3. **Review.** The Zoning Administrator evaluates the findings. A home over the floor area threshold below goes to the Planning Commission at a public hearing, and a hillside property may need a public hearing as well.
4. **Appeal window.** Any affected person may appeal a decision within 15 days of the Zoning Administrator or Planning Commission action.

The building permit’s plan review is a separate track: 2 weeks for the first review and 2 weeks for each later round on the city’s November 2026 timeline. The while-you-wait One Stop review is no shortcut for a second story: its policy says the Architectural Permit must be obtained before a One Stop appointment is scheduled, and additions over 400 square feet are not eligible at all.

### Notice to the neighbors comes first

Every property that shares a property line or a corner with the lot, or sits across the street from it, gets a Notice of Application and a copy of the proposed plans and signs to acknowledge them; an owner who lives at another address is sent both by certified mail. The signed notices and the certified mail receipts go in with the Architectural Permit application (city handout, revised August 2019).

A neighbor’s signature is an acknowledgment, not a vote: the form says it “does not suggest approval of the project.”

## What addition and kitchen clients say

> "The quality of QA Builders work speaks for itself, and I have received numerous compliments from friends, family, and neighbors on the stunning transformation of my kitchen."
>
> Edith S., Complete kitchen remodel

> "Also, the team always showed up on time and left our place clean before they left each day, which we really appreciated."
>
> Suzanne C., Full kitchen upgrade

> "Sal, my project manager, was very informative, communicative, honest and helpful. He really cares about customer satisfaction."
>
> Richard H., Kitchen renovation

> "The work was completed ahead of schedule, the craftsmanship is excellent, and they clearly take pride in getting things right."
>
> Vijay M., Family room and master bedroom addition

> "QA Builders built an addition to my home and they did a great job. Everyone from QA Builders team was professional, honest, very friendly and helpful."
>
> Jeffrey M., Home addition

> "We have remodelled other homes before, so can spot a bad job when we see one, they did a fantastic job with the finishes in the kitchen and floors."
>
> Lulua B., Kitchen, floors and painting

[Read more homeowner reviews →](https://qabuilders.com/testimonials/)

## When floor area sends a Redwood City home to the Planning Commission

Redwood City measures floor area ratio (FAR) as the total covered area of all floors, the attached garage included, measured to the outside of the stud walls. Basements no more than 24 inches above average finished grade, detached structures (garages, sheds, accessory structures and ADUs) and architectural features such as decks, bay windows and chimneys are left out. The FAR rule applies to Architectural Permit applications for single-family homes, with the exceptions in the table (city FAR brochure, urgency ordinance effective August 26, 2019):

| Project | Path in the city’s handouts |
| --- | --- |
| New two-story home or second-story addition, total home up to 3,000 sq ft and 45% FAR (the later tips’ reading; see the note below) | Architectural Permit, evaluated by the Zoning Administrator; a hillside property may also need a public hearing |
| Total home over 3,000 sq ft or over 45% FAR (the later tips’ reading; see the note below) | Planning Commission review at a public hearing, with three added findings: setbacks, garage placement and massing in line with homes on the same street |
| Second-story addition of 100 sq ft or less | Architectural Permit; the FAR threshold does not apply |
| New home or addition on a lot under 5,000 sq ft | The FAR threshold does not apply |
| Ground-floor addition | The FAR threshold does not apply |

A note on the threshold: the 2019 brochure words the trigger once as 3,000 sq ft or 45% “whichever is greater” and elsewhere as either one; the city’s later Architectural Permit tips put it as homes “over 3,000 sq. ft. or over 0.45 FAR”. On a lot near either number, settle with Planning which reading applies before the design is fixed.

Two city documents shape what the review looks for. The City Council’s Neighborhood Compatibility Guiding Principles (adopted December 3, 2018) ask for garages placed in the neighborhood’s pattern, a front entry feature where the street’s homes have one (human scale, no taller than the first-floor eave), front and side setbacks that line up with homes on the same street where the pattern is strong, and existing mature trees kept where appropriate. The Residential Design Guide covers massing, building design, details, landscape and the architectural styles found in the city; no particular style is required. How we plan and build second stories and other additions is on our [home additions page](https://qabuilders.com/home-additions/).

## Ground-floor additions, and what the city adds over 1,000 sq ft

The city’s handouts do not settle whether a ground-floor addition needs an Architectural Permit; the FAR brochure only exempts it from the hearing threshold. Before a one-story design is drawn, confirm that and the lot’s zoning standards with a planner; Planning Division staff can be booked online for Zoom appointments.

### Street frontage work for a large addition

The city’s Local Development Standards handout (City Code sections 18.234 to 18.243) attaches frontage work to large residential additions over 1,000 square feet:

- sidewalk and driveway apron sections with a large crack (over 3/4 inch) or shattering are replaced;
- curb and gutter sections with cracks over 3/4 inch are replaced;
- asphalt above or below the new gutter is replaced at least 12 inches out;
- a minimum eight-inch water line runs from the nearest connection through the frontage if the existing line is under six inches.

The handout is undated, so confirm the list with the city before pricing a large addition.

## Older homes, protected trees and Redwood Shores lagoon lots

Census figures (American Community Survey 2020-2024) count 32,135 housing units in Redwood City, 43.2% single-family detached and 13.2% single-family attached. The 1950s are the largest decade of construction, with 21.2% of units; 52.4% were built in 1969 or earlier and 64.2% before 1980.

That age matters at the permit counter. The city’s Architectural Permit tips ask whether a home was built more than 50 years ago, or is a historic resource or in a historic district, and say a historic report may be needed to judge its historic value before a remodel.

Two more rules apply to some lots and not others:

- **Protected trees.** The Tree Preservation Ordinance protects every tree on private property with a trunk over 38 inches around (twelve inches in diameter), measured between 6 and 36 inches above the ground. The Street Tree Ordinance protects all street trees on public property along the roadways, at any size: the trees that sidewalk and curb work in front of a lot can reach. Any act on a protected tree needs a permit first; there is no permit fee at this time, permits are normally processed within ten working days, and an illegal removal is fined $500 per tree plus a replacement tree equal to the appraised value of the original.
- **Redwood Shores lagoon banks.** The Redwood Shores Lagoon Bank Policy and Construction Guidelines (adopted July 24, 2006) cover new construction, and maintenance or repair of existing improvements, that may affect the stability of the slopes on the interior waterways.

## What Redwood City’s August 2026 ADU handout allows

Redwood City’s ADU handout, effective August 2026, summarizes the planning and building rules (the full law is Government Code sections 66310 to 66342):

- **How many:** one detached ADU, one converted ADU and one JADU per single-family lot. JADUs are allowed only within single-family homes on lots zoned R-1 and RH.
- **Size:** 150 sq ft minimum; detached ADUs up to 850 sq ft for a studio or one bedroom and 1,200 sq ft for two or more bedrooms; attached ADUs up to 50% of the existing home. A JADU is up to 500 sq ft, plus up to 150 sq ft to reach an entrance, with interior access if it shares a bathroom with the main home.
- **Height:** 16 feet for most detached ADUs; 18 feet plus 2 feet for a roof pitch within half a mile of a major transit stop; attached ADUs up to the limit of the zoning district.
- **Setbacks and lot rules:** 4 feet from side and rear lines for new construction, the existing setbacks for a converted structure. Lot coverage, pervious area and open space rules cannot prevent an 800 sq ft ADU.
- **Parking and occupancy:** no new off-street parking for ADUs or JADUs. Owner occupancy is not required for an ADU; with a JADU that shares sanitation, the owner lives in the JADU or the main home. Rentals under 30 days are prohibited for both.

The city’s ADU web page still shows older limits (850 sq ft for one bedroom, 1,000 sq ft for more); the August 2026 handout is the newer document.

The handout also lists building requirements. A fire flow test with the Engineering Department has to show enough water supply, and for new detached ADUs the city says the typical lead time is several weeks.

Fire sprinklers may be required if the house already has them, or if an attached ADU and any substantial remodeling together reach 50% of the main living area or 1,000 sq ft, whichever is less (JADUs are exempt). The ADU also needs a one-hour separation from the main house, its own heating system, a side-hinged entry door (a garage or patio door cannot be the main entrance) and a new address before occupancy; in a FEMA flood hazard area, its lowest floor sits above the base flood elevation.

As listed on the city’s ADU page in November 2026, base permit fee estimates are $3,999.53 for 0 to 400 sq ft or a garage converted to an ADU, $4,660.62 for 401 to 600 sq ft and $5,321.71 for 601 to 800 sq ft, with valuation-based and other fees on top. The page says no impact fees are charged on ADUs under 750 sq ft, while the school district may have the right to collect school impact fees, a decision independent from the city.

ADU and JADU plans get 2-week review rounds. Pre-reviewed plans are meant to bring the city’s review to 30 days, though a project built from one is still subject to zoning requirements, site-specific conditions review and school district fees. The permit is finaled only after the owner completes the city’s ADU homeowner survey. Our [ADU builder page](https://qabuilders.com/adu-builders/) and [garage conversion page](https://qabuilders.com/garage-conversion-san-jose/) cover the build itself.

5.0 on BuildZoom; Top 1% of California contractors (BuildZoom score); 500+ projects completed; 15+ years in the Bay Area; CSLB #1073096, licensed and insured.

## City or county? North Fair Oaks and Emerald Lake Hills

Not every home next to Redwood City is permitted by the city. North Fair Oaks is an unincorporated part of San Mateo County, about 798 acres bounded by Redwood City to the north, west and southwest, Atherton to the east and Menlo Park to the northeast; permits there come from the county’s Planning and Building Department, which issues them for unincorporated San Mateo County.

Emerald Lake Hills has its own county Design Review Officer. In June 2026 the Board of Supervisors adopted an updated Design Review Ordinance that made design review staff-level from July 23, 2026, for county design review areas outside the Coastal Zone.

A first check is the city’s mapping program at redwoodcity.org/gis: enter an address to see details about the property, its utilities, neighborhood and land use.

## A Redwood City kitchen we remodeled in 2022

Open the project for the before, during and after photos and the scope of work.

Complete kitchen remodel, Redwood City (project card).

[See more of our projects →](https://qabuilders.com/portfolio/)

## From tear-out to finishes: the kitchen job

In 2022 we remodeled this Redwood City kitchen completely. The photos from the start of the job show the old kitchen during tear-out, then the walls opened to the studs before the finishes went in.

The finished room is a galley kitchen with white shaker cabinets, quartz counters and a glass mosaic backsplash that runs behind the stainless range and hood. Floating shelves and lighting under the wall cabinets finish it. More finished kitchens, and what our work as a kitchen remodeler in Redwood City and nearby towns includes, are on our [kitchen remodeling page](https://qabuilders.com/kitchen-remodeling/).

## How Redwood City reviews a kitchen or bathroom remodel

Redwood City’s Building Division sorts interior remodels into two kinds, non-structural and structural, and its plan review timeline (updated November 2026, “subject to change”) gives both the same target: 2 weeks for the first review and 2 weeks for each later round. The city counts a week as five business days and notes that unexpected delays can happen.

A residential interior alteration or remodel can also qualify for the city’s One Stop service, where building staff review the plans and comment on them, or approve them, while you wait. In person it runs Monday to Thursday, 1:00 to 3:00 p.m. at City Hall, and the applicant must bring a digital copy of the project; online, the application goes in through eTRAKiT and One Stop is requested by email once the permit has a number. The One Stop policy (effective December 1, 2022) leaves out:

- additions over 400 square feet, and smaller additions combined with an interior remodel of existing space;
- combinations of additions and alterations finaled in the last three years;
- ADUs and changes of occupancy;
- projects valued above the threshold set by the California Department of General Services.

Where a project also needs an Architectural Permit, as a second-story addition does, that permit must be obtained before the One Stop appointment is scheduled.

Regular submittals go in electronically, and plans are checked against the 2025 California Building Standards Code with Redwood City’s local amendments, in effect since January 1, 2026. Our [bathroom remodeling page](https://qabuilders.com/bathroom-remodeling/) shows the bathroom side of this work.

## Services and price ranges for Redwood City homes

- **[Home additions](https://qabuilders.com/home-additions/):** second stories go through the Architectural Permit above, and additions over 1,000 sq ft bring frontage work. Costs typically range from $200-$400 per square foot depending on complexity, materials, and whether structural work is needed. We provide detailed estimates during consultation.
- **[Kitchen remodeling](https://qabuilders.com/kitchen-remodeling/):** like the 2022 galley kitchen above. Costs vary based on scope, materials, and kitchen size. A typical Bay Area kitchen remodel ranges from $30,000 to $100,000+. Your dedicated project manager will provide a detailed estimate during your free consultation.
- **[Bathroom remodeling](https://qabuilders.com/bathroom-remodeling/):** reviewed in the same 2-week rounds as other interior remodels. Bathroom remodel costs range from $15,000 to $50,000+ depending on scope, materials, and size. We provide detailed estimates during your free consultation.
- **[Whole-house remodeling](https://qabuilders.com/full-home-remodeling/):** for a home over 50 years old, start with the historic check. Costs vary widely based on scope, from $100,000 for cosmetic updates to $500,000+ for extensive renovations. We provide detailed estimates after an in-home consultation.
- **ADUs and garage conversions:** under the August 2026 handout’s limits. ADU costs typically range from $150,000 to $350,000+ depending on size, type, and finishes. Garage conversions are generally the most affordable option.
- **[New custom homes](https://qabuilders.com/new-construction/):** a new single-family home gets 3 weeks for the city’s first review and 2 weeks for later rounds, and a two-story one needs the Architectural Permit. Custom home construction in the Bay Area typically costs $300-$600+ per square foot, depending on specifications, materials, and site conditions.

## From consultation to warranty on a Redwood City project

1. **Consultation.** Contact us for a free consultation and estimate.
2. **Design.** Layout & 3D Renderings. We collaborate with top architects and engineers. For a second story, the neighbor notices go out before the Architectural Permit application.
3. **Permits.** We provide complete design-build and construction services, including permitting and project management.
4. **Construction and inspections.** Redwood City books inspections online through eTRAKiT, currently 3 to 8 days in advance, Monday to Friday between 9:00 a.m. and 4:00 p.m., with the estimated inspection time posted after 9 a.m. on the day.
5. **Completion & Warranty:** Final walk-through, punch list completion, and our comprehensive warranty.

## What Redwood City homeowners ask about permits, ADUs and timing

### How long does Redwood City take to review a remodel or addition permit?

Most residential work gets 2 weeks for the first review and 2 weeks for each later round, by the Building Division’s plan review timeline updated in November 2026: interior remodels (structural or not), additions, ADUs and JADUs, decks and demolition all sit at that pace, while a new single-family home gets 3 weeks for the first review. A week means five business days, and the city notes delays can happen. A second story also needs its Architectural Permit, a separate planning step with its own neighbor notice.

### Do my neighbors have to approve a second-story addition in Redwood City?

No. They have to be notified before the Architectural Permit application goes in, not to approve it: each adjacent owner and tenant signs to acknowledge the Notice of Application and plans, and the form says this “does not suggest approval of the project.” Any affected person can still appeal a decision within 15 days of the Zoning Administrator or Planning Commission action.

### Can I build both an ADU and a JADU on my Redwood City lot?

Yes. The city’s August 2026 handout allows one detached ADU, one converted ADU and one JADU on a single-family lot. The JADU has to be inside a single-family home on a lot zoned R-1 or RH, and it can be up to 500 sq ft.

### Is my home permitted by Redwood City or by San Mateo County?

Check the address on the city’s mapping program (redwoodcity.org/gis) or ask the Planning Division. North Fair Oaks is unincorporated San Mateo County, where the county’s Planning and Building Department issues permits, and Emerald Lake Hills goes through the county’s own design review.

### How long does a kitchen remodel or a second-story addition take?

Plan on the city’s review rounds plus construction. In the United States in 2026, kitchen remodel construction typically starts from about 6 weeks and a full second-story addition, from design to completion, starts from about 6 months, by national guides (market figures, not our schedule). In Redwood City, add 2-week plan review rounds and inspections booked 3 to 8 days ahead.

### Do I need a permit to remove a tree for an addition in Redwood City?

Yes, if the tree is protected: any tree on private property with a trunk over 38 inches around (twelve inches in diameter), measured between 6 and 36 inches above the ground, and any street tree on public property along the roadway, at any size. The permit has no fee at this time and is normally processed within ten working days.

## Talk to us about your Redwood City second story, kitchen or ADU

Every project receives a dedicated project manager so you know who to turn to every step of the way.

Contact us for a free consultation and estimate. Reach us at [(669) 213-8077](tel:+16692138077) or [Contact@qabuilders.com](mailto:Contact@qabuilders.com), or use the [project form](https://qabuilders.com/contact/), and tell us your neighborhood, whether you already have drawings, and what you are planning: a second story, a ground-floor addition, a kitchen or an ADU.

[Schedule Consultation](https://qabuilders.com/contact/)

[Call Us Now](tel:+16692138077)
