---
title: "Home Remodeling in Fremont | Additions, Kitchens & Baths"
description: "Home remodeling in Fremont by a licensed contractor (CSLB #1073096): addition limits by R-1 district, city review days and the 50-year historic check."
url: "https://qabuilders.com/service-areas/fremont/"
---

Fremont homes, from Niles to Warm Springs

# Home Remodeling in Fremont

Home remodeling in Fremont: additions and second stories first, then kitchens and baths.

[Call (669) 213-8077](tel:+16692138077)

[Free estimate](https://qabuilders.com/service-areas/fremont/#quote)

## Get a free estimate

Tell us about your project and one of our representatives will get back to you.

(Quote form: same as the other town pages.)

[Areas we serve](https://qabuilders.com/service-areas/) / Fremont

QA Builders remodels homes in Fremont: home additions and second stories first, then kitchens, bathrooms, whole-house remodels, ADUs, garage conversions and new custom homes, all under one licensed San Jose general building contractor (CSLB #1073096). In Fremont, an interior remodel or a one-story addition under 750 sq ft skips design review; a second story does not.

Call [(669) 213-8077](tel:+16692138077) or use the form above to book a free consultation and estimate for your Fremont home.

5.0 on BuildZoom; Top 1% of California contractors (BuildZoom score); 500+ projects completed; 15+ years in the Bay Area; CSLB #1073096 licensed and insured.

## How much can you add in Fremont? Limits by R-1 district

Fremont sets the size of an addition by zoning district. The city’s handout for first and second story additions (updated 4 June 2026, drawn from Fremont Municipal Code 18.90.040) gives these numbers for the R-1-6, R-1-8 and R-1-10 districts:

| Standard | R-1-6 | R-1-8 | R-1-10 |
| --- | --- | --- | --- |
| Front yard | 20 ft | 25 ft | 25 ft |
| Rear yard, one story | 25 ft | 25 ft | 30 ft |
| Rear yard, two story | 25 ft | 30 ft | 35 ft |
| Interior side, first story (minimum / both sides) | 5 / 12 ft | 7 / 16 ft | 8 / 20 ft |
| Interior side, second story (minimum / both sides) | 6 / 15 ft | 8 / 20 ft | 10 / 20 ft |
| Street side on a corner lot | 10 ft | 12.5 ft | 12.5 ft |
| Height, one story / two story | 17 / 30 ft | 17 / 30 ft | 17 / 30 ft |
| First-story lot coverage, garage included | 40% | 40% | 40% |
| Second story, cap in square feet | 1,000 | 1,250 | 1,500 |

The second story is held to the lesser of two numbers: half the first-floor area (attached garage included), or the cap in the table (3,000 sq ft in R-1-20 and 6,000 sq ft in R-1-40). Two details change the math. Any room inside the house taller than 17 feet counts toward the second-story cap, while an attic conversion, or a second floor built inside the slope of the existing roof, is outside it. Planned Districts and PUDs follow their own standards on the city’s eGIS map, so we read your parcel’s district before any design starts.

### Setbacks you may keep, and the rear-yard 30% rule

A one-story addition may line up with the side setbacks the house legally has today, as long as no side drops below 5 feet. A second story gets the same allowance only when the lot right next door already has a two-story home built the same way (FMC 18.170.040).

At the back, an addition may reach to within 10 feet of the rear line if everything built in the required rear yard covers no more than 30% of it. The city’s own example: a 200 sq ft addition in a 1,500 sq ft required rear yard covers 13.3% and is allowed (FMC 18.170.050).

- **Solar access:** an addition that raises the height of the house keeps a setback of at least twice the height difference from structures along the northerly lot lines (FMC 18.186).
- **Eaves and bays:** into a required front, rear or street-side yard, eaves may project 2 feet 6 inches; bay windows, balconies and chimneys 3 feet, over no more than a third of the wall (FMC 18.170.060).
- **Survey and title:** building outside the existing building lines and within 24 inches of a minimum setback calls for a boundary survey, and any new floor area calls for a preliminary title report with the planning application.

## Design review or not: Fremont's posted plan review days

The city’s Building Permit Plan Review Timeline (updated November 2026, marked subject to change) lists review days for each round of plan check and whether design review applies:

| Project | Design review | First review | Each later review |
| --- | --- | --- | --- |
| Interior remodel | No | 15 days | 10 days |
| One-story addition under 750 sq ft | No | 15 days | 10 days |
| One-story addition, 750 sq ft or more | Yes; concurrent on request | 20 days | 15 days |
| Second-story addition | Yes; concurrent on request | 20 days | 15 days |
| ADU or JADU, attached or detached | Yes; concurrent on request | 8 days | 6 days |
| Pre-approved ADU plan | No | 5 days | 3 days |
| New single-family home, not in a tract | Yes; concurrent on request | 25 days | 15 days |

"Concurrent" means design review and building plan check run side by side instead of one after the other; the request is made at filing, under Apply for Permit, then Building. Applications go through Citizen Access, the city’s online portal, where a 2% convenience fee applies to card payments. Once plan review starts, the record names a Team Lead, the contact for code questions and for added scope before the permit is issued.

These are review days per round, not the length of the whole job: each set of comments the plans need to answer adds a round. We provide complete design-build and construction services, including permitting and project management, so the drawings, the filing and every round of comments stay with one team.

## What clients wrote about their additions, kitchens and conversions

> "The work was completed ahead of schedule, the craftsmanship is excellent, and they clearly take pride in getting things right."
>
> Vijay M., Family room and master bedroom addition

> "They gave us a competitive bid and were very flexible with timing to accommodate my schedule."
>
> Vivian W., Garage remodel with mudroom and laundry move

> "The project they did for me is ADU Garage Conversion, big and complicated project but Sal made it simple as possible and it went very smooth thank to him and his well organized crew."
>
> John R., ADU garage conversion

> "Frederico is an accomplished artisan, who is much more interested in getting the job done right, than in getting it done fast. Even so, they were done before Sal's estimated time, which is some sort of miracle in contractor work."
>
> Amy S., Kitchen remodel

> "Also, the team always showed up on time and left our place clean before they left each day, which we really appreciated."
>
> Suzanne C., Full kitchen upgrade

> "This project was completed on time and within budget and the quality of work was amazing. Sal pays a lot of attention to detail and ensures that his team complies to his high standards."
>
> Chuck J., Kitchen remodel

[Read more homeowner reviews →](https://qabuilders.com/testimonials/)

## Kitchen and bath remodels on Fremont's like-for-like express permit

A kitchen or bathroom that keeps every wall where it is can go through Fremont’s express permit, applied for online and issued automatically. The city describes it as "For residential kitchen and/or bathroom remodel projects that do not involve the removal or alteration of any walls." Removing or changing a wall, or adding work outside the room, moves the project to a regular interior-remodel permit with plan review.

The express plan forms list what the inspector checks:

- **Kitchen:** at least two 20-amp small-appliance circuits, arc-fault protection on the 120-volt kitchen circuits, GFCI on every countertop receptacle and on the dishwasher, faucets at 1.8 gallons per minute or less, a dishwasher air gap, and smooth metal ducting for the range hood.
- **Bathroom:** toilets at 1.28 gallons per flush, showerheads at 1.8 and lavatory faucets at 1.2 gallons per minute, a shower of at least 1,024 square inches that fits a 30-inch circle, waterproofing to 70 inches, an anti-scald valve limited to 120 degrees F, and a 50 CFM fan switched apart from the lights.

One line on the kitchen form is worth reading before you set a budget: because of the added circuits, the main electrical panel "may be required to be upgraded based upon field verification." Costs vary based on scope, materials, and kitchen size. A typical Bay Area kitchen remodel ranges from $30,000 to $100,000+. Your dedicated project manager will provide a detailed estimate during your free consultation.

Bathroom remodel costs range from $15,000 to $50,000+ depending on scope, materials, and size. We provide detailed estimates during your free consultation.

## What a larger Fremont addition can set off

Some Fremont rules switch on only once an addition reaches a certain size or changes the front of the house. Each one is best checked at the drawing stage:

- **Fire sprinklers:** the whole house needs them "When an addition to an existing residential structure exceeds 50% of the existing structure or the combined addition and the existing structure exceeds 5,000 square feet." A licensed C-16 sprinkler contractor designs the system, its plans get their own 15-day review, the first sprinkler inspection comes before the rough framing inspection, and the Alameda County Water District may need to upgrade the water meter.
- **Covered parking:** Fremont counts any fully enclosed private room as a bedroom, offices and dens included; four bedrooms or fewer need two covered spaces, five or more need three. New bedrooms built as part of an addition need no covered parking beyond what the house already has.
- **Landscape plan and street tree:** a landscape plan goes into the plan set with an addition, and altering the front elevation brings a street tree if the property has none.
- **Cart storage:** 27 square feet in the garage for garbage, recycling and organics carts; only if the garage lacks room may the same space sit outside in a side or back yard.

We check each of these against your house before the plans are drawn.

## Fremont houses by decade, and the 50-year historic check

Fremont’s housing is mostly from the 1960s through the 1980s. In the Census Bureau’s American Community Survey (2020 to 2024), 52.8% of the city’s 81,579 housing units were built before 1980, and the two decades from 1970 to 1989 alone hold 45.2%; only 2.7% date from 2020 or later. Detached single-family houses make up 56.3% of the stock.

House age matters here for more than wiring and pipes. "Properties 50 years or older must undergo this evaluation prior to the issuance of any permits for demolition, relocation, or exterior modifications," the city says of its Historic Evaluation Request. In 2026 that reaches houses built in 1976. The planning checklist offers ways through: a house under 50 years is ineligible, a single-family home built after 1945 in a numbered tract is exempt, and otherwise the city evaluates it or a DPR 523 form is filed. The evaluation asks for at least four color photos showing each elevation.

Fremont formed in 1956, when five townships came together; it now recognizes Centerville, Niles, Irvington, Warm Springs and Mission San Jose as distinct districts. Where the zoning map adds the Historical Overlay, exterior changes need historical architectural review, and the Historical Architectural Review Board reviews historic resources, as well as buildings other than single-family homes inside historic districts.

### Glenmoor Gardens, Mission Palms and Mission Ranch

Three neighborhoods carry their own design guidelines on top of the district numbers. In Glenmoor Gardens (R-1-6), the handout lists no two-story standards and points to the Glenmoor Gardens Design Guidelines, with a 17-foot one-story height measured to the ridge and a roof pitch of 3:12 to 5:12.

In Mission Palms, a one-story home may cover 40% of the lot, a two-story home’s total floor area is held to 35% of the lot area, and the second story to 60% of the first or 1,000 sq ft, whichever is less. In Mission Ranch, a second story is possible only when first-floor coverage reaches 22% without passing 30%, and the whole house is then held to 30% of the lot.

### Hillside lots marked H-I

Lots in the Hillside Combining District carry (H-I) after their district name. There, height is measured to the peak of the roof from the plane of an approved as-built grading plan, not to the roof’s mid-point as on flat lots, and slope, soil stability and views can limit what fits (FMC 18.130).

## Fremont ADU rules: its own permit, size limits and fees

Fremont’s ADU rules come from Ordinance 06-2023, adopted 11 July 2023 and in effect since 11 August 2023. An ADU is its own project: it gets a ministerial design review permit, a building permit and a new address, and the city rejects a request that bundles it with work on the main house. A home addition can run alongside a JADU.

| Rule | ADU | JADU |
| --- | --- | --- |
| Size | New floor area up to 1,000 sq ft attached or 1,200 sq ft detached | Up to 500 sq ft, inside the house or an attached garage |
| Height | Attached 30 ft (or the zone height if lower); detached 16 ft, or 18 ft within a half-mile walk of a major transit stop or high-quality transit corridor, plus 2 ft for a roof pitch matching the house | Inside the existing house |
| Setbacks | 4 ft side and rear | Inside the existing house |
| Owner occupancy | Not required | Required only if it shares a bathroom |
| Door to the main house | No direct door for an attached ADU; a shared laundry room or mudroom may connect them only if it is one-hour fire-rated with protected openings, none leading into a bedroom | Allowed |

An ADU needs its own PG&E electric meter, with water from the Alameda County Water District and sewer from Union Sanitary District. A garage conversion has no size, height or setback limit, may add up to 150 sq ft for its entrance or exit, and needs no replacement parking. ADUs do not count toward lot coverage and pay no development impact fees, though permit fees, utility connection fees and school fees to the Fremont Unified School District may apply. Rentals under 30 days are not allowed.

Pre-approved plans carry a flat $1,000 plan review fee; plans from the 2022 code cycle are no longer valid since 1 January 2026. ADU costs typically range from $150,000 to $350,000+ depending on size, type, and finishes. Garage conversions are generally the most affordable option.

## Additions, kitchens, baths and more: a Fremont note on each

- [Home additions and second stories](https://qabuilders.com/home-additions/): sized to your district’s coverage and second-story cap, with the sprinkler threshold checked before drawings. Costs typically range from $200-$400 per square foot depending on complexity, materials, and whether structural work is needed. We provide detailed estimates during consultation.
- [Kitchen remodeling](https://qabuilders.com/kitchen-remodeling/): on the express permit when walls stay, on plan review when the layout opens up.
- [Bathroom remodeling](https://qabuilders.com/bathroom-remodeling/): fixtures, shower size and waterproofing to the city’s express checklist.
- [Whole-house remodels](https://qabuilders.com/full-home-remodeling/): often paired with an addition, so the 50% sprinkler rule and the historic check are read together. Costs vary widely based on scope, from $100,000 for cosmetic updates to $500,000+ for extensive renovations. We provide detailed estimates after an in-home consultation.
- [ADUs and JADUs](https://qabuilders.com/adu-builders/), including [garage conversions](https://qabuilders.com/garage-conversion-san-jose/): filed as their own project, with PG&E’s separate meter planned in.
- New custom homes: a non-tract house takes 25 days in its first city review. Custom home construction in the Bay Area typically costs $300-$600+ per square foot, depending on specifications, materials, and site conditions.

## How a Fremont job runs: design, Citizen Access, inspections

1. **Free consultation and estimate.** Contact us for a free consultation and estimate. The consultation covers your goals, the house and the lot, and ends in a detailed estimate.
2. **Design.** We collaborate with top architects and engineers. The plans answer your district’s limits, the house’s age and any overlay before anything is filed.
3. **Permits.** We file in Citizen Access, ask for concurrent review where it applies, and answer each round of comments through the Team Lead.
4. **Construction.** Within 500 feet of homes, Fremont allows work 7:00 a.m. to 7:00 p.m. on weekdays and 9:00 a.m. to 6:00 p.m. on Saturdays and holidays, with no Sunday construction. With 15+ years and 500+ projects, QA Builders has the experience to coordinate multiple trades.
5. **Inspections.** Every permit needs inspections. The city takes requests until 2:00 p.m. the business day before and emails the inspector’s name after 6 p.m. the evening before. The city also requires a current Fremont business tax registration from anyone doing business in Fremont before a final inspection can be scheduled.
6. **Completion & Warranty:** Final walk-through, punch list completion, and our comprehensive warranty

## Questions Fremont homeowners ask before a remodel

### Does QA Builders hold a California contractor license for Fremont jobs?

Yes. QA Builders is a licensed California general building contractor (B license #1073096), bonded, with workers’ compensation insurance on file with the state board. We handle a Fremont job from design and permits through the final inspection.

### Do I need a full permit to redo a kitchen in Fremont if no walls move?

No full plan review is needed when no wall is removed or altered: Fremont’s like-for-like express permit covers kitchen and bath remodels of that kind and is issued automatically online. Moving a wall, or adding work outside the kitchen, takes the project to a regular interior-remodel permit, which the city posts at 15 days for the first review.

### How many days does Fremont take to review a second-story addition?

The city posts 20 days for the first plan review of a second-story addition and 15 days for each later round, and design review can run at the same time when concurrent review is requested at filing. Building follows the permit; for a full second-story addition, design to completion, national guides across the United States in 2026 give a time frame starting from about 6 months.

### If I turn my Fremont garage into an ADU, do I have to replace the parking?

No. Fremont’s ADU handout says a garage conversion needs no replacement parking, has no size, height or setback limit, and may add up to 150 sq ft for its entrance or exit. It still goes in as its own ADU project with a separate PG&E electric meter.

### My Fremont house is over 50 years old. What changes?

Before the city issues a permit for exterior changes, demolition or relocation, a house 50 years or older goes through a Historic Evaluation. A single-family home built after 1945 in a numbered tract is exempt; for other houses the city evaluates the property from color photos of every elevation, or a DPR 523 form is filed.

## Before you call: three things about your Fremont lot

Every project receives a dedicated project manager so you know who to turn to every step of the way.

Contact us for a free consultation and estimate. Reach us at [(669) 213-8077](tel:+16692138077) or [Contact@qabuilders.com](mailto:Contact@qabuilders.com), or use the [project form](https://qabuilders.com/contact/), and tell us three things if you know them: your zoning district (R-1-6, R-1-8 or another), the year the house was built, and if you plan to build up or out.

[Schedule Consultation](https://qabuilders.com/contact/)

[Call Us Now](tel:+16692138077)
